TOWER CRANES

December 2020

ASSEMBLY OF A CUSTOM CRANE BY HELLIWINCH
East River (Reunion)

As part of a project for EDF, GLI worked on the Rivière de l'Est water catchment site in the heart of Reunion, to replace the old 427E tower crane with an MCT 58 CHI. This was specially designed so that the elements can be assembled by helicopter.

October 2021

SOREZE VIADUCT
Soreze (Mauritius)

As part of the construction of the highest viaduct in Mauritius, in Sorèze, our teams supplied and assembled two Potain MD 485 cranes for our client TGBV.
A vertiginous construction site between the two axes M1 and A1

October 2021

VOLCANO REFUGE
Piton de la Fournaise (Reunion)


Our teams (semi-trailer drivers, mobile crane drivers, crane operators and crane fitters) erected a new MDT 269 Potain crane on behalf of our client BBOI as part of the construction of the new Volcan refuge.

The specificity of the site, the difficulty of access and the environmental constraints made this service exceptional in a majestic setting.

JUNE 2022

POTAIN H30-30C
Port Louis (Mauritius)

In Mauritius, assembly and rental of a crane Damn H30-30C for our client Nundun Gopee and its Ebene operation with front anchorage in the business district of Port Louis!